What action should be taken when pit toilets are filled to within 2 feet of the surface?

  1. Cover them with 2 feet of compact dirt

  2. Stop using them immediately

  3. Drill additional holes

  4. Empty the tanks manually

The correct answer is: Cover them with 2 feet of compact dirt

The action of covering pit toilets with 2 feet of compact dirt is appropriate because it helps to prevent contamination and odors by sealing the contents below the surface. When the waste in a pit toilet approaches the top, it can pose health risks and lead to environmental issues, such as contamination of groundwater. By covering the toilets with soil, you effectively reduce exposure and make the site safer until a more permanent solution, such as relocating or emptying, can be executed. It’s essential to note that simply stopping usage or emptying tanks may not be sufficient as it doesn't address the immediate need to contain the waste and manage the facility responsibly. Drilling additional holes might lead to further problems, as it could enable easier access to the waste and potentially cause more contamination or structural weakening of the pit. Thus, the correct approach focuses on the immediate need for safety and containment by covering the pit toilets properly.